Finished: Mossy Baby Sweater
Hey look, it’s a finished baby sweater! This one has been waiting for its write-up for over a week, but lately life has been getting in the way of blogging. And returning e-mail. I'm working on it, I promise!

Oh fine, it's not the same color as moss.
The Specs:
Pattern: My own.
Size: About 3 months.
Yarn: GGH Samoa (50% cotton, 50% acrylic)
Needles: Size 7 circs for the body, size 7 straights for the sleeves.
Start to finish: March 4 - April 24.
For: Little Nephew E.

I couldn't find any snakes or snails or puppy-dog tails, so you'll have to settle for pine-needles and rocks.
If you cast your mind back to early March, you may recall that this sweater started out as a slightly modified version of this pattern from Rebecca Baby and Kids No. 8. After about 100 bazillion modifications, I ended up with what you see here.
The Plan:
I wanted a baby sweater with similar construction to the EZ baby sweater: knit in the round but with sleeves knit flat (though they could be done in the round. Whether a short little seam or knitting in the round takes longer is a bit of a toss-up). I knew I wanted zig-zaggy cables (I can't get enough zigzags. I bet you never noticed).

What really happened:
That was about where the planning ended. I pretended to crunch some numbers and cast on. After I knitted my way to the bottom of the sweater I decided that the neck was too small (resulting in the great backwards seed-stitch rip-out of '07). And then there was the night I decided I didn't like the spacing of the buttonholes so I dropped back the button-band stitches and picked them back up with new yarn-over buttonholes in the proper spots. And we won't go into how I knitted the first arm three times before I got it to look like it would fit a human baby (as opposed to a t-rex baby).
I feel a little bit like I knitted the middle of the sweater first and then fiddled around on the edges for a long time. Maybe because I did?

Patternage?
I took a bunch of notes thinking that maybe I'd write out a pattern, but I feel like I need to knit this one again the way normal people knit (you know, from the start to the finish without all that wishy-washy rippyness) before I put it down on paper. Luckily, people just keep having babies so it shouldn't be too much of a problem finding another one to knit for.

Tree, tree, tree...tree, tree, tree...
Final Verdict: I like it! Even if it was the slowest fast knit ever executed.
p.s. I finished up the Flowerbasket Shawl last Sunday! More finished object goodness coming your way soon! (Though I do realize that "soon" in Elli-land has come to mean "sometime hopefully in the next week.")




